Now Playing

Teddy Swims

Bad Dreams

Urgent Repairs Planned for Deteriorating Reading Bridge

Metal plates have been fitted to the wooden Gunters Brook footbridge on the Kennet Side in Reading after the planks started to deteriorate.

The bridge is a well-used route for pedestrians and cyclists travelling to and from the town centre, so the plates have been put down to keep it safe while longer-term work is planned.

Rob White (Green, Park), leader of the councils main opposition, raised concerns about the bridge at a Reading Borough Council meeting, asking how long the temporary fix will last, what contingency plans exist if it has to close, and when a permanent repair will happen.

John Ennis (Labour, Southcote), the councils transport lead, confirmed the wooden structure is showing signs of deterioration.

He said rotten floorboards have been replaced and more recently plated as a managed approach to keep the bridge open and the public safe.

The council has commissioned its structural consultants to draw up a scheme to replace the wooden deck boards with Glass Reinforced Plastic (GRP), which lasts much longer than timber.

The works are scheduled for this financial year and should be completed by Spring 2027.

Ennis warned the footbridge will need to be closed to carry out the floorboard replacement safely, with a signed diversion in place during the works.

Advance warning signs will be erected, residents will get letters, and a press release will advise users of the planned closure and works.

People can use open sections of the Kennet Side, Sidmouth Street and Queens Road while the bridge is closed.

The exchange took place at the policy committee meeting last month.

James Aldridge, Local Democracy Reporter

On Air Now

  • Dougie Scott

    7:00pm - 10:00pm

VIP Club

Sign up to get more with the Listener Club!

Get Our Apps

  • Available on the App Store
  • Available on Google Play
  • Just ask Amazon Alexa